Mark (TheCraftsmansPath.com) on February 23rd, 2008

Our experiences in life are shaped by many things: family, friends, school, things that we do, places we travel to and everything we encounter along the way. As we grow and learn we are malleable and many impressions, both small and large are left in the soft shell of our existence. We learn from seeing, […]

Continue reading about The loss of a teacher

Mark (TheCraftsmansPath.com) on February 16th, 2008

With the carcase of the table completed in the last post, it was finally time to build and dovetail the drawer. This is kind of a long post but, I thought everyone would rather see the entire process at once rather that breaking it into multiple posts. So, here we go! The design for this […]

Continue reading about Queen Anne Side Table: Dovetailing the drawer

Mark (TheCraftsmansPath.com) on February 5th, 2008

In the last post I documented the process of dovetailing the top rail and doing the scroll work on the front and side aprons of the table. With all of the joinery completed on the table carcase it was time to glue up some of the components and to begin work on the interior drawer […]

Continue reading about Queen Anne Side Table: Glue Up and drawer runner assembly

Mark (TheCraftsmansPath.com) on February 1st, 2008

With the tenon work on the aprons completed, it was time to turn my attention to adding the top rail above where the drawer will go. Also, previously the aprons were left square to more easily facilitate cutting the tenons but, now it was time to add the decorative Queen Anne scroll work to them. […]

Continue reading about Queen Anne Side Table: Dovetailed top rail and scroll work